Skip to main content

PFIZER

The Barclay White/CIC Construction Group joint venture performed this fast track project for Wyeth as an expansion of the parental production building, increasing capacity of existing utility systems. Much of the construction was required to be completed within the existing operational facility.


open
project
statistics
  • Name:PFIZER
  • Location:Carolina, Puerto Rico
  • Architects:L G Scott Architects & Engineers (CH Caribe)
  • Cost:$63,700,000
  • Scope:
    • The Main Building D consisted of a:
    • Class 100 filling and sterilization areas
    • 800 SF of expansion to the existing central utility chiller building 
    • Upgrade existing purified water system
    • Upgrade electrical generation capacity
    • 16,000 SF of renovations to the existing parental facility
    • Construction Management
    • General Contractors
    • Self-performed all Civil, Structural and Architectural work
close project statistics