Interior Architectural Finishes. CUP and Fermentation Buildings
The scope of work included the Central Utilities Building (CUB) with floors identified as level 0 and level 1. Level 0 includes an electrical room, mechanical spaces, offices, corridors, and lockers. Level 1 includes bathrooms, offices, mechanical spaces, electrical/IDF rooms, and corridors roof.
The Fermentation is a multi-level building that connects to the API support building.